Print Back
Hydro-sheave couplings are mounted to the motor shaft end and provide minimal overhung loads for parallel (belt-driven) shaft applications. The smaller sizes (7-12.4) are installed very quickly and easily utilizing a slotted collet in which no drilling or tapping is required. The slotted collet is finished bored to fit standard NEMA B motor shaft dimensions. The larger sizes (15-24) are installed with a center locating bolt that does require drilling and tapping to ensure proper mounting. Themore
Unit of Measure

Specifications

Size

19

Bore Size

2-7/8 in

Dimension A

22.244 in

Dimension B

7.480 in

Dimension D

2.875 in

Dimension Q

1-1/4 7 UNC

Dimension S

7/8 9 UNC

Dimension T

8.449 in

Dimension V

3.205 in

Dimension J

7.000 in

Dimension W

0.750 in

Dimension B1

3.779 in

Maximum C

17.913 in

Dimension C1

20.315 in

Dimension E

8.858 in

Dimension F

5.1484 in

Dimension G

6.250 in

Nr. H

3

H Diameter

5/8 11 UNC

Dimension I

12.992 in

Dimension K

1.378 in

Dimension L

4.331 in

Dimension M

7-1/4 in

Dimension N

8.976 in

Q. D. Hub Size

J

Less Oil Weight

187.2 lb

Maximum Oil Volume

4.22 gal

Manufacturer

Wichita Clutch

Tolerance

N/A Dimension D

up to 2 inch: +0.001/-0.000
from 2 to 4 inch: +0.0015/-0.000

Dimension W

up to 0.500 inch: +0.002/-0.000
from 0.625 to 1 inch: +0.003/-0.000

Note

N/A HSDD